Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Carestream Launches NEW Lux HD 35 and Lux HD 43 Detectors for Medical Imaging

    June 10, 2026

    U.S. Polo Assn. Returns to Downtown London as Official Apparel and Jersey Partner of Chestertons Polo in the Park

    June 9, 2026

    GA-ASI Announces Investments in Six Dutch Companies

    June 9, 2026
    Basra DailyBasra Daily
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Basra DailyBasra Daily
    Home » Sinopec’s First Geothermal Power Production Pilot Project Connects to Grid
    PR Newswire

    Sinopec’s First Geothermal Power Production Pilot Project Connects to Grid

    November 6, 2024
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    XIANYANG, China, Nov. 6, 2024 /PRNewswire/ — Sinopec Star Co., Ltd., a clean energy subsidiary of China Petroleum & Chemical Corporation (HKG: 0386, “Sinopec”), has received  the grid access permit for its medium and deep geothermal power generation pilot project (the “Project”) in Xianyang, Shaanxi Province, which is officially connected to the grid to produce power.

    Sinopec’s First Geothermal Power Production Pilot Project Connects to Grid.

    The Project, which is now connected to the grid and generating power, marks Sinopec’s first foray into geothermal electricity production and represents China’s inaugural pilot of thermoelectric helium integration—a significant stride toward enhancing the utilization of geothermal resources and optimizing the nation’s energy mix.

    Located in Xianyang in the Guanzhong region, where there is a large medium-low temperature sedimentary basin-type geothermal field known for large scale, high temperature, and superior water quality, the project has selected a geothermal well in Baoshi Jiayuan community with a depth of 3,000 meters and wellhead water temperature of around 102 degrees Celsius.

    During the heating season, the project extracts geothermal water for heating and simultaneous helium extraction for low-load power generation. In the non-heating season, it operates at full load for continuous power generation, also extracting helium. The facility heats an area of 120,000 square meters and generates 700,000 kWh annually.

    Sinopec Star has tackled the core technologies to extract the “golden gas” – helium – in geothermal wells, which is of great strategic importance and widely applied in numerous fields, including  aerospace, R&D, healthcare, and industrial productions. As a major manufacturing country, China has a high demand for helium, but has long relied heavily on imports. Helium is mainly extracted from natural gas, coal bed methane, and by-products of air separation units that contain helium.

    Located in the Weihe Basin, the project area is rich in water-soluble and free helium, along with other gas resources. Sinopec’s experts have discovered unusually high helium concentrations in the region’s geothermal wells. At its Xianyang site, Sinopec Star has advanced the separation and purification of water-soluble helium, achieving 99.99% pure helium through membrane separation and variable pressure adsorption technologies. This success has provided insights for the industrial-scale production of geothermal water-soluble helium.

    Sinopec is a leader in advancing geothermal development, having established more than 100 million square meters of geothermal heating capacity in 72 cities throughout China. Its project in the Xiong’an New Area has been recognized by the International Renewable Energy Agency (IRENA) as a global showcase pilot.

    Logo

    Photo – https://mma.prnewswire.com/media/2549886/Sinopec_s_First_Geothermal_Power_Production_Pilot_Project_Connects_Grid.jpg
    Logo – https://mma.prnewswire.com/media/960416/SINOPEC_Logo.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/sinopecs-first-geothermal-power-production-pilot-project-connects-to-grid-302297222.html


    Related Posts

    Carestream Launches NEW Lux HD 35 and Lux HD 43 Detectors for Medical Imaging

    June 10, 2026

    Fastmarkets closes the CBAM pricing gap with daily view of carbon import costs

    June 9, 2026

    THE GORE® VIABAHN® FORTEGRA VENOUS STENT RECEIVES MDR APPROVAL

    June 9, 2026

    MUST Debuts All-Scenario Hybrid Energy Series at SNEC 2026

    June 9, 2026

    Changan launches new energy vehicle DEEPAL brand in Oman with advanced range extended electric vehicles

    June 8, 2026

    Angel Yeast Showcases Yeast-Based Innovations for Animal Nutrition at TUYEM 2026

    June 8, 2026
    Current News

    WHO reports 507 Ebola cases across Congo and Uganda

    June 8, 2026

    Korean cosmetics exports hit US$5.6 billion in five months

    June 8, 2026

    FAO backs $3.9bn GEF-9 funding for food security

    June 8, 2026

    Egypt GDP rises 5.2% as foreign reserves climb

    June 8, 2026

    Global health bodies seek $518 million for Ebola response

    June 6, 2026

    UN envoy cites regional push to end Middle East conflict

    June 6, 2026

    Investor interest lifts UAE real estate in global index

    June 6, 2026

    Abu Dhabi advances climate adaptation tools

    June 5, 2026
    © 2026 Basra Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.